Aria 8.0 Podręcznik Użytkownika Strona 229

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 228
Chapter 6: Shutdown and Maintenance 229
Lubricating the Sample Injection Chamber O-Ring
The O-ring at the bottom of the sample injection chamber should be lubricated as
needed to maintain proper operation.
1 Verify that the loading port is in the down position, and open the hinged
cover.
2 Check the O-ring (located at the opening in the bottom of the chamber) to
see if it is dry.
3 If the O-ring is dry, it must be lubricated with O-ring lubricant from the
accessory kit.
a Remove the clear plastic tube holder from the tube holder base.
b Apply a small amount O-ring lubricant to the O-ring inside the
chamber and to the top, outside beveled edge of the tube holder base.
This is where the base contacts the O-ring inside the sample injection
chamber.
c Wipe off any excess lubricant.
d Replace the tube holder on the base.
Figure 6-31 Loading port with tube holder removed
Apply lubricant to outside
beveled edge of tube holder
base.
Przeglądanie stron 228
1 2 ... 224 225 226 227 228 229 230 231 232 233 234 ... 343 344

Komentarze do niniejszej Instrukcji

Brak uwag