Aria 8.0 Podręcznik Użytkownika Strona 191

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 190
Chapter 6: Shutdown and Maintenance 191
Verify that there is an O-ring in the closed-loop nozzle before installing it.
Figure 6-1 Closed-loop nozzle installed in flow cell
4 Connect the air and fluid lines to the stainless steel ethanol (ETOH)
shutdown tank. See Figure 6-2 on page 192.
a Disconnect the air line from the sheath tank and connect it to the air
port on the ETOH shutdown tank.
b Disconnect the fluid line from the output side of the sheath filter and
connect it to the fluid port on the ETOH shutdown tank.
Keep the sheath filter attached to the sheath tank. Do not run ethanol
through the sheath filter.
c Click Done.
The system starts the cleaning process, and then displays a message at the
bottom of the window.
Przeglądanie stron 190
1 2 ... 186 187 188 189 190 191 192 193 194 195 196 ... 343 344

Komentarze do niniejszej Instrukcji

Brak uwag